Global Drone SurveysGet a quote
Tower crane above concrete formwork on an active build

FIXED CAMERAS / Reading & Thames Valley

Construction Time-Lapse in Reading

Give your Reading project team a consistent view of phased commercial and logistics works, with image delivery agreed around the reporting programme.

Plan your Reading time-lapse

Illustrative construction photograph.

01 / REGIONAL TIME-LAPSE

Keep reporting consistent between phases.

On business parks and logistics developments, a single wide view may not cover successive work areas. Identify which phases need their own reference view and how each should appear in the project record.

02 / CONSTRUCTION APPLICATIONS

Capture change across active developments.

Commercial builds

Record structure, envelope and external works for recurring progress meetings.

Logistics projects

Plan views around loading areas, access changes and steel erection.

Phased refurbishments

Agree where cameras can remain as contractors hand over different work areas.

03 / CAMERA SYSTEMS

Keep cameras accessible and secure.

We review mounting, access for servicing, available power and connectivity with the site team. Agree capture intervals and which stakeholders need access to uploaded images.

04 / PLANNING YOUR BRIEF

Brief the reporting audience.

Tell us who needs current stills and who needs an edited sequence. A remote project board and a site manager may need different views or delivery dates.

Maintain continuity through temporary changes.

Flag cabin moves, temporary power changes and working hours so that installation and reporting can follow the programme.

05 / OUTPUTS & REPORTING

Progress stills and milestone films.

A dated image set, selected reporting stills and edited sequences can be agreed in advance.

If several views are used, label each consistently so progress can be compared across reporting periods.

Pair fixed coverage with selected aerial visits.

Repeat drone surveys can capture site layout and works beyond the installed cameras. Scope aerial coverage and outputs separately.

06 / YOUR QUESTIONS

Planning time-lapse in Reading?

Can we review images remotely?

Remote access can be scoped around connectivity, permissions and the agreed delivery schedule.

Can separate phases have separate edits?

Yes. Identify the milestones and reporting deadlines in the brief.

How many cameras are needed for a large development?

That depends on the work fronts, obstructions and the viewpoints needed by stakeholders. One camera may give a useful overall record while separate positions may be needed for different phases. A plan of the works helps identify where extra coverage would add value.

Can a camera stay in place as scaffolding changes?

It may need reframing or relocating if the work area becomes obscured. Share the proposed scaffold and crane sequence when choosing a mounting position. Any later move should be planned with the site team and noted in the project record.

What happens when the site internet connection is unreliable?

Remote review depends on usable connectivity. Local capture may still be feasible, but uploads and status checks can be delayed. The connectivity and access arrangements should be assessed before the reporting method and maintenance schedule are agreed.

YOUR NEXT PROJECT / Reading

Start with the site and the programme.

Send the address, expected duration, main work stages and any available camera positions. Tell us who needs the images and films, and when they need them. We’ll help scope installation, monitoring and the delivery package.

Explore time-lapse coverage