Exposed sites
Assess mounting stability and servicing access before choosing a position.

FIXED CAMERAS / Plymouth & surrounding area
Record the progress of your Plymouth build with fixed cameras planned around the work fronts, site exposure and key dates in your programme.
Plan your Plymouth time-lapseIllustrative construction photograph.
01 / REGIONAL TIME-LAPSE
A useful groundworks viewpoint can disappear behind steelwork or temporary buildings. Share the site layout and sequence so we can identify a primary view and agree when to review it.
02 / CONSTRUCTION APPLICATIONS
Assess mounting stability and servicing access before choosing a position.
Use the construction programme to identify when a second view or a planned move would help.
Agree dates and capture intervals for lifts, pours and other events the team wants to document.
03 / CAMERA SYSTEMS
We review a suitable structure or mast, available power and mobile connectivity. Capture and upload schedules are agreed separately, particularly where reception varies.
04 / PLANNING YOUR BRIEF
A marked plan showing work zones, proposed viewpoints and access restrictions makes the initial scoping conversation more useful.
If the view needs to move, date the change and identify both positions so your team can follow the sequence in later reports.
05 / OUTPUTS & REPORTING
Agree which stills the site team needs for reporting and what the finished sequence should show.
Choose the handover formats and whether interim edits are needed for specific milestones.
Separate drone visits can show site-wide change and areas outside the fixed view, subject to planning and operating conditions.
06 / YOUR QUESTIONS
Yes, a move can be scoped around the programme and site access.
Share connectivity constraints early so image delivery can be scoped accordingly.
We look for a stable mounting point with a useful view of the work area and consider exposure, weather protection and safe maintenance access. Provide site drawings and planned changes to temporary structures. The final position depends on the site assessment and the available permissions.
A power solution must be scoped against the camera, capture interval, location and maintenance access. Battery or solar arrangements may be possible in some settings, but they cannot be assumed suitable for every programme. We agree a practical power and servicing plan before installation.
Agree whether you need dated stills, a curated progress sequence or an edited time-lapse film, including any preferred format and milestones. A clear handover brief also covers who can access the material and when equipment can be removed safely from the site.
YOUR NEXT PROJECT / Plymouth
Send the address, expected duration, main work stages and any available camera positions. Tell us who needs the images and films, and when they need them. We’ll help scope installation, monitoring and the delivery package.
Explore time-lapse coverage