Multi-phase commercial developments
Maintain an overview of visible structural and envelope stages. Define which work areas are essential to the record as cranes and temporary works change the skyline.

FIXED CAMERAS / Central & Greater London
Keep clients and delivery teams informed when they cannot all be on site. Our London construction time-lapse service records agreed views at scheduled intervals, with remote access to uploaded images and films that explain the programme’s progress.
Plan your London time-lapseLondon and the River Thames.
01 / REGIONAL TIME-LAPSE
An urban construction camera may depend on a neighbouring building, a temporary structure or an area with tightly controlled access. Establish who can authorise the mounting and how servicing will take place before choosing the final view. We scope the camera around the building sequence and reporting needs, rather than treating the nearest high point as the best position.
02 / CONSTRUCTION APPLICATIONS
Maintain an overview of visible structural and envelope stages. Define which work areas are essential to the record as cranes and temporary works change the skyline.
Document visible changes on an occupied or constrained site. Framing and access need to respect neighbouring uses, site boundaries and areas the client wants excluded.
Agree selected images and interim films for client teams, contractors and funders. A concise visual update can explain the sequence without giving every recipient access to the full image archive.
03 / CAMERA SYSTEMS
Connected camera systems can upload images through suitable mobile or site connectivity. Authorised users can review the latest successful upload and compare earlier dates. Define who needs access, the intended image coverage and your retention requirements. This is scheduled photographic monitoring, not continuous live video or a replacement for site supervision.
04 / PLANNING YOUR BRIEF
For a London site with restricted access, identify the proposed mounting owner, installation hours, required inductions and the contact who can arrange a return visit. Mark sensitive areas on the site plan. Agreeing these practical details early helps avoid selecting a viewpoint that cannot be installed or maintained.
A useful client update needs a clear date range and a view that relates to the programme. Agree whether stakeholders need a regular overview, a milestone sequence or both. If the camera is moved, label the transition. If an upload is delayed, distinguish the capture date from the date the team receives the image, so the record is not mistaken for a live site condition.
05 / OUTPUTS & REPORTING
The package can include dated photographs, selected reporting images, milestone extracts and a final edited time-lapse film. Resolution, edit length and delivery formats are agreed around their use. Where aerial context would help, drone progress visits can be specified separately and assessed for the exact London location.
Specify which teams need remote access to uploaded images and which only need selected stills or short edits. Agree framing, retention and distribution around neighbouring premises and the project’s reporting needs.
Send the site address, programme, building heights where known and available mounting options. We review power, shading, connectivity and safe access with your team. Mobilisation depends on the site and permissions; an existing project elsewhere in London does not establish access or feasibility for a new installation.
06 / YOUR QUESTIONS
Potentially, subject to the owner’s permission, suitable mounting, a useful view and safe access. Do not assume access to a neighbouring roof is included in the construction site’s permissions.
We confirm a realistic date once mounting, access, power and the programme are understood. The brief and site permissions determine mobilisation; there is no blanket installation deadline.
We agree the access and reporting package around the team. Some recipients may need selected images or films rather than access to all captured material.
They are different activities. Fixed-camera planning concerns mounting, access, framing, power and connectivity. Any drone work is scoped separately, including airspace and operational feasibility.
Camera placement and framing should focus on the agreed works area. Tell us about overlooking, public routes and neighbouring occupants during the site review. The client should agree appropriate access, retention and sharing arrangements for the resulting images.
LONDON / CONSTRUCTION IN FOCUS
Cranes, hoists and rising structures can alter a camera’s view. Review the construction sequence when choosing mounting positions and planning any camera moves.
YOUR NEXT PROJECT / London & Greater London
Send the address, expected duration, main work stages and any available camera positions. Tell us who needs the images and films, and when they need them. We’ll help scope installation, monitoring and the delivery package.
Explore time-lapse coverage